Before Rough surface, weeds, utility pole, |
After Graded lawn, grass, underground |
|
Before Removed all walls & ceiling |
After New concrete floor, added spiral |
|
Before Silo Doors not opened in over 40 Here we cleaning debris from joints. |
Before Lifting plates in the doors had to be before the lifting lugs could be |
|
Before Lifting plates dry fit and marked. |
Before Modified plate attached w/hardened |
|
After 120-Ton Crane starts to pull on silo |
After Crane left overnight with pressure |
|
After Adding additional jacks, finally |
After Silo Door Finally Fully Opened. |
|
Before Silo door opened shows water & |
Before With water out, we see more debris. |
|
Up close of the debris in the silo. |
2 Cranes, cutting tourches, many man |
|
Weeks of cutting & lifting debris. |
Large Beam assemblies removed. |
|
Many days worked until dark. |
Small Skid Steer Helped clear debris. |
|
After Finally all debris was removed. |
After Looking up at Silo Cap from clean |
|
Before Blast Door Support Beam Head Banger. |
After Blast Door head Banger Beam removed. |
|
Work on Sight-Tube removal. |
Entry Stairwell Cleaned up. |
|
Lower level of LCC debris gone. |
Steel Walker Vault Door Functioning. |
|
Topside Looking South, all cleaned up. |
Overview of cleaned up site. |