Before
Rough surface, weeds, utility pole, neglect. | 
After
Graded lawn, grass, underground utility, clean. |

Before
Removed all walls & ceiling debris. | 
After
New concrete floor, added spiral stairs. |

Before
Silo Doors not opened in over 40 years.
Here we cleaning debris from joints. | 
Before
Lifting plates in the doors had to be re-tapped
before the lifting lugs could be attached. |

Before
Lifting plates dry fit and marked. | 
Before
Modified plate attached w/hardened bolts. |

After
120-Ton Crane starts to pull on silo door. | 
After
Crane left overnight with pressure applied. |

After
Adding additional jacks, finally opened. | 
After
Silo Door Finally Fully Opened. |

Before
Silo door opened shows water & debris. | 
Before
With water out, we see more debris. |

Before
Up close of the debris in the silo. | 
Before
2 Cranes, cutting tourches, many man hours. |

Before
Weeks of cutting & lifting debris. | 
Before
Large Beam assemblies removed. |

Before
Many days worked until dark. | 
Before
Small Skid Steer Helped clear debris. |

Before
Finally all debris was removed. | 
Before
Looking up at Silo Cap from clean floor. |

Before
Blast Door Support Bean Head Banger. | 
Before
Blast Door head Banger Beam removed. |

Before
Work on Sight-Tube removal. | 
Before
Entry Stairwell Cleaned up. |

Before
Lower level of LCC debris gone. | 
Before
Steel Walker Vault Door Functioning. |

Before
Topside Looking South, all cleaned up. | 
Before
Overview of cleaned up site. |